Partnering with Vancouver HVAC and plumbing companies, JZ Electric Ltd. completes the electrical component of heat pump installations. As certified electricians, we assess the building’s existing electrical load to determine whether it has sufficient capacity to support the requirements of the heat pump system. If needed, we’ll upgrade the electrical panel or separate dedicated circuits for the heat pump.
Obtain electrical permits
Determine if electrical panel upgrade is required before installation
Run dedicated circuits for HVAC units
Supply/install disconnects and breakers
Supply/install Teck cable and associated hardware